2026Austrian Climate and Energy Fund · 4 funding programmes
Energy management funding in Austria: it will never be cheaper
Reduxi products start at just €69. On top of that, the Austrian Climate and Energy Fund covers up to 50% of the cost of smart energy management, and 30% of shared battery storage. Reduxi controls your PV, battery, heat pump and wallbox automatically.
Important for every programme: apply or register first, then order.
01Funding overview
Four funding programmes. Which one fits you?
The Climate and Energy Fund (Klima- und Energiefonds) runs two calls that matter for Reduxi customers. Each programme has its own label (A1, A2, B1, B2), so you can see further down which requirement belongs to which funding. You apply directly at umweltfoerderung.at. Reduxi works with energy advisors and is happy to recommend one if you need help with your application.
A · Energy management 2026
For a single household or business site. Deadline 15 April 2027, while budget lasts.
B · Shared energy use 2026 (Gemeinsame Energienutzung)
For energy communities, shared generation and peer-to-peer projects. Applications 1 October 2026 to 10 March 2027.
02Requirements at a glance
Which requirements apply to which funding
One row per requirement, one column per programme. A tick means the requirement applies to that programme.
| Requirement | A1ProgrammeHouseholds | A2ProgrammeBusinesses | B1ProgrammeShared storage | B2ProgrammeDigitalisation |
|---|---|---|---|---|
| Who and how much | ||||
| Who applies | Private individuals, household connection | Companies, municipalities, associations; low voltage, under 250 kW; not energy communities | Investor, owner and operator of the storage | Organiser or participant of an existing, active project |
| Funding | 50%, max. €600 | Up to 30%, max. €20,000 (large enterprises 20%) | 30%, max. €100,000 | 50%, max. €10,000 net |
| Research bonus | +€100 | +€1,000 | None | None |
| Deadline | 15 April 2027 | 15 April 2027 | 10 March 2027 | 10 March 2027 |
| Before you order | ||||
| Register or apply before any binding order | Yes | Yes | Yes | Yes |
| Energy sharing in the local areaNahebereich, minimum number of metering points | No | No | Yes | Yes |
| Comparison offer per main item | No | No | Yes | No |
| Technology | ||||
| Energy management system required | Yes | Yes | No | Not required; smart meter readers, data tools and control are eligible |
| EMS controls at least two devicesPV, storage, charging point, heat pump | Yes | Yes | No | No |
| Four minimum functionsdevice control, dynamic prices, metering at the grid connection, load management | Yes | Yes | No | No |
| Control runs locallyno pure cloud solution | Yes | Yes | No | No |
| New stationary battery from 100 kWh, ≥ 75% renewable energy | No | No | Yes | No |
| Consulting included | Not eligible | Eligible | Planning up to 10% eligible | Required |
| After installation | ||||
| Installation by a licensed specialist company | Yes | Yes | Yes | No |
| Five-year commitment | Operating mode | Operating mode | Joint use of the storage | No |
| Time to implement | 6 months | 6 months + 3 for the claim | 9 months (up to 250 kWh) or 12 months, + 3 for the claim | 6 months + 3 for the claim |
| Software subscriptions eligible | No | No | No | No |
03Energy management 2026 · A1 & A2
Four required functions. Reduxi has them all.
The energy management funding for households (A1) and businesses (A2) requires the same four functions. Your electrical contractor confirms them on the claim form. The control unit must run on site, even without a permanent internet connection.
Five years of grid-friendly operation
With A1 or A2 you commit to operating the system in one of these ways for five years. Switching between them is allowed if you report it.
04Energy communities & shared generation
Energy management by Reduxi. EEG and GEA billing by Enixi.
Reduxi is always your energy management. If you run an energy community (EEG) or a shared generation plant (GEA, gemeinschaftliche Erzeugungsanlage), our partner Enixi is happy to support you with the billing.
06How it works
Five steps to your funding
Energy management 2026
Register
With the Climate and Energy Fund at umweltfoerderung.at, before you order anything. Costs incurred before that are not eligible.
Order Reduxi
The right Reduxi product, starting at just €69.
Have it installed
By a licensed electrical contractor, within 6 months. They confirm the four minimum functions.
Choose an operating mode
Dynamic tariffs are billed by your energy supplier; EEG or GEA billing via Enixi.
Claim
Submit your invoices and receive the funding. Opt in to the accompanying research to get the bonus.
Shared energy use 2026
Check the project
An energy sharing project in the local area, with enough participating metering points.
Get offers
For storage (B1), at least one comparison offer per main item. For B2, plan the consulting.
Apply
At umweltfoerderung.at, before any binding order. Deadline 10 March 2027.
Implement
B2 within 6 months. B1 within 9 months (up to 250 kWh) or 12 months.
Claim
Submit your invoices within 3 months and receive the funding.
07FAQ
Frequently asked questions about energy management funding
Still unsure? Call us on +43 676 361 89 51.
Can I get funding for a system I have already bought?
No. In every programme you must register or apply before placing any binding order.
Who is allowed to install the system?
For A1, A2 and B1, a licensed specialist company. For A1 and A2 they confirm the minimum functions on the claim form.
What is the accompanying research?
Only for A1 and A2: if you share operating data for research, you get a bonus of €100 for households or €1,000 for businesses.
How long is the funding available?
A1 and A2: until 15 April 2027, as long as the budget of €2.45 million per programme lasts. B1 and B2: from 1 October 2026 to 10 March 2027.
Will there be funding for battery storage in 2027?
The federal government has announced a further PV funding framework from 2027 with a focus on storage, including retrofitting storage to existing PV systems. As of September 2026 nothing has been decided and no amounts or rates have been published. Shared battery storage is already funded with 30% under B1.
What does Enixi do?
Enixi only handles the billing for energy communities (EEG) and shared generation plants (GEA). Energy management is always done by Reduxi; other operating modes such as dynamic tariffs are billed by your energy supplier.
✉Contact Reduxi now
Find out more about Reduxi
I’d be happy to introduce Reduxi to you personally in a Teams call.
Information without guarantee, as of October 2026. Reduxi does not check or submit funding applications. Sources: Austrian Climate and Energy Fund, programmes “Energiemanagement 2026” (households and businesses) and “Gemeinsame Energienutzung 2026”.