Austrian Climate and Energy Fund. 4 funding programmes in Austria.

Investment grant for energy management in Austria:  Secure your funding now

Reduxi products start at just €69 (before funding). On top of that, the Austrian Climate and Energy Fund covers up to 50% of the cost of a smart energy management solution and 30% of smart, connected battery storage.

Producten van Reduxivanaf €69
Financieringspercentage tot50%
Financiering tot⁠€21,000for businesses, municipalities and associations

Important for every programme: register first, then implement.

Reduxi app: real-time energy flow of PV systems, batteries, heat pumps and wallboxes, plus production and consumption charts

375+Compatibele apparaten
50+supported brands
10 maart 2027from household to EEG
15 april 2027from registration to final submission

01Overzicht van de financiering

Vier financieringsprogramma's. Welke past bij u?

The Climate and Energy Fund offers two funding schemes with a total of four funding options that are relevant for Reduxi customers. Each option has its own code (A1, A2, B1 or B2). This shows you at a glance which requirements apply to each funding option.

Applications are submitted directly via umweltfoerderung.at.

Need help with your application? Reduxi works with experienced energy advisors and is happy to put you in touch with the right contact person.

A · Energiebeheer

Per site and applicant. Deadline: 15 April 2027, while the budget lasts.

Private owners, households

A1Programma A

tot€700

Financieringspercentage50%
Maximum€600
Functiebonus+€100

For a Reduxi solution at your site that controls at least two devices, e.g. PV and an EV charger.

Vereisten voor A1 ↓

Businesses, municipalities, homeowners’ associations (WEG)

A2Programma A

tot⁠€21,000

Financieringspercentage30%
Maximum⁠€20,000
Functiebonus⁠+€1,000

For Reduxi at a business site with a connected load of up to 250 kW at low voltage.

Vereisten voor A2 ↓

B · Shared energy use – optimised system integration

For all active energy-sharing models (EEG, GEA, peer-to-peer and self-supply systems). Applications until 10 March 2027.

Digitalisering en flexibiliteit

B1Programma B

tot⁠€12,000

Financieringspercentage50%
Maximum (netto)⁠€12,000
Adviesvereist

Digital platforms that make energy flows visible at a site and between sites. For Reduxi products that read real-time data, smart control in existing communities and the related installation – always combined with consulting.

Vereisten voor B1 ↓

Gedeelde batterijopslag

B2Programma B

tot⁠€100,000

Financieringspercentage30%
Maximum⁠€100,000
Storage capacityAt least 100 kWh

For a new battery storage system shared by an energy-sharing project for at least five years.

Vereisten voor B2 ↓

02Vereisten in één oogopslag

Which requirements apply to which funding programme

Eén regel per vereiste, één kolom per programma. Een vinkje betekent dat de vereiste van toepassing is op dat programma.

 

Vereiste A1ProgrammaHuishoudens A2ProgrammaBedrijven B1ProgrammaDigitalisering B2ProgrammaGedeelde opslag
Wie en hoeveel
Who can apply Privépersonen, huishoudelijke aansluiting Businesses, municipalities, homeowners’ associations (WEG); low voltage, up to 250 kW Organiser or member of an existing, active project Investeraar, eigenaar en exploitant van de opslag
Financiering 50%, max. €600 Up to 30%, max. €20,000 (20% for large companies) 50%, max. €12,000 30%, max. €100.000 netto
Functiebonus +€100 ⁠+€1,000 Nee Nee
Termijn 15 april 2027 15 april 2027 10 maart 2027 10 maart 2027
Voordat u bestelt
Register or apply before you place a binding order. Ja Ja Ja Ja
Energy community on siteLocal area, minimum number of metering points Nee Nee Ja Ja
Comparison quote per main item Nee Nee Nee Ja
Technologie
An energy management system is required Ja Ja Niet verplicht; slimme meetapparatuur, data-tools en controle zijn hiervoor in aanmerking. Nee
EMS controleert ten minste twee apparatenPV system, storage, charging point, heat pump Ja Ja Nee Nee
Vier minimale functiesDevice control, dynamic prices, metering at the grid connection, load management Ja Ja Nee Nee
De controle verloopt lokaalno cloud-only solution Ja Ja Nee Nee
New stationary battery system with 100 kWh capacity, ≥ 75% renewable energy Nee Nee Nee Ja
Inclusief advies Niet in aanmerking komend In aanmerking komend Noodzakelijk Planning for up to 10% of approved projects
Na de installatie
Installatie door een erkend specialistisch bedrijf Ja Ja Ja Ja
Vijfjarig contract Operation Operation Nee Shared use of the storage
Tijd voor implementatie 6 maanden 6 months + 3 months for the final claim 6 months + 3 months for the final claim 9 months (up to 250 kWh) or 12 months, + 3 months for the final claim
Softwareabonnementen in aanmerking komen Nee Nee Nee Nee
ValidValidity not guaranteedSamenvatting van de officiële richtlijnen, per oktober 2026. De richtlijnen zijn bindend.

03Energiebeheer · A1 & A2

Four required functions. Reduxi meets them all.

Energy management funding for private customers (A1) and businesses (A2) requires the same four functions. The control unit must work on site, even without a permanent internet connection.

Reduxi Controller – energy management device for smart energy management

Eén Reduxi-systeem voor alle vier de programma's

Reduxi products from €69. Choose the right setup for your programme:

A1

Reduxi Controller met P1 UltraReal-time control and monitoring plus smart meter reading at the grid connection point.

A2

Reduxi Controller of Reduxi IndustrialWith AI-based optimisation, peak shaving and load control

B1

P1 Ultra readers for real-time monitoringOptionally with the Reduxi Controller and the Reduxi Gateway for active real-time control and monitoring.

B2

Optioneel: Reduxi controleert de gedeelde batterijControls and optimises charging and discharging of the EEG battery in line with the energy needs of the EEG members.

Actieve apparaatbeheer

PV system, battery, heat pump and wallbox. More than 375 compatible devices from over 50 brands.

Dynamische prijssignalen

The AI plans charging and consumption based on dynamic electricity prices, weather and usage history.

Metering directly at the grid connection point

Consumption and feed-in are read directly from the smart meter via the P1 port.

Laadbeheer

Peak load limit with current limiting. Decisive from 2027 under the new grid tariffs.

04A winning duo for energy sharing

Energy optimisation by Reduxi. Energy billing by enixi.

Reduxi controls your energy in real time. On top of that, enixi supports you in running and billing your energy-sharing projects.

reduxi – AI Electricity Control

Reduxi · Real-time control

Energy management for every operating state

Optimised energy use, peak shaving and adaptation to dynamic tariffs. Reduxi’s AI-driven EMS monitors, controls and optimises the production, storage and use of electrical energy at your commercial and industrial sites.

  • PV system, battery, heat pump, charging stations and other loads
  • AI-optimalisatie met dynamische tarieven
  • Maximale scherpe en laadbeheersing
  • Smart control of shared batteries
Enixi – energy connects.

+Enixi · Organisation and billing

Networking and billing for energy sharing

enixi is the digital platform for shared energy use (EEG, BEG, GEA, peer-to-peer and self-supply systems) and a competent partner that helps you bill your shared energy.

  • Fast set-up and growth of communities via web app
  • Automated document creation for energy-sharing projects
  • Clear management of members, contracts and documents

05Gedeelde energiegebruik · B1 & B2

Financiering voor energie-gemeenschappen en gedeelde opwekking

The “Shared Energy Use 2026” programme funds local energy-sharing projects (local area), such as energy communities, joint generation facilities and peer-to-peer projects. Applications run from 1 October 2026, 12:00, to 10 March 2027, 12:00, at umweltfoerderung.at.

B1 Digitalisering

Digitalisering en flexibiliteit: 50%, tot €10.000

Funds are approved on a rolling basis while the €2 million budget lasts.

  • Established and active energy-sharing project in the region
  • Advies is vereist: hardware of software op zichzelf is niet in aanmerking te komen
  • Toepasselijk: installatie van slimme meetapparaten, informatie- en visualisatiehulpmiddelen voor realtime gegevens en prognoses, centrale controle van productie, opslag en verbruik, sensoren en communicatie
  • Meets at least two of the six criteria, e.g. reducing generation and load peaks, or digitalisation to optimise members’ consumption.
  • Niet in aanmerking: voortdurend gebruik van software, kassabonnen van minder dan €100 netto, diensten van gelieerde bedrijven

Met Reduxi: Smart meter readers, real-time monitoring platform and consulting in one package – see below.

B2Gedeelde batterijopslag

Gedeelde batterijopslag: 30%, tot €100.000

Tot 250 kWh: goedgekeurd op basis van voortdurende evaluatie. Meer dan 250 kWh: geselecteerd door een deskundige jury.

  • Nieuwe, stationaire batterij die kan worden aangesloten op het elektriciteitsnetwerk, minstens 100 kWh netto
  • At least 75 percent of the annual energy comes from the project’s renewable plants.
  • Shared use within the project for at least five years
  • Installatie en inbedrijfstelling door een gespecialiseerd bedrijf
  • At least one comparison quote per main item
  • Eligible: battery, chargers and control technology, metering systems, gateways and control technology

Met Reduxi: Reduxi can control the shared battery to suit the project, e.g. with forecast-based optimisation

B1Digitalisering

Het Reduxi-pakket voor B1: 50% gefinancierd

Reduxi reads each member’s data from the smart meter, collects it in real time on a monitoring platform and uses it to shift consumption so the energy community reaches the highest possible self-consumption.

Reduxi also supplies smart meter readers (P1 Ultra)Hardware, monitoring and consulting from one source.

1

Smartmeterlezers voor alle ledenThe Reduxi P1 Ultra records consumption and feed-in at every grid connection point.

2

Real-time monitoringCollect real-time data from all energy community members and optimise in real time

3

Actieve controle (optioneel)Reduxi Controller en Gateway voor opslag, warmtepompen en laadpunten

4

Advies en opzetRequired for funding through Reduxi

Example: a package worth €20,000 receives the maximum funding of €10,000. Ongoing platform subscriptions are not eligible.

06Zo werkt het

Vijf stappen naar financiering

You fill in one form. Reduxi, enixi and our energy advisors take care of the rest.

1

Submit your request

Fill in the form below: contact details, desired funding and a short project description.

2

Initial call & letter of intent

We clarify your project and the right funding. Then you sign the letter of intent via a link.

3

Quote

Reduxi and your installer prepare your quote, including all documents for the funding application.

4

Funding application & approval

Our energy advisor submits the application. Then we release the project.

Order only after the application is received

5

Installation & final claim

Your installer installs Reduxi, optionally with energy-sharing billing via enixi. The final documents are then submitted.

1Funding request

Start your funding request

Your request goes directly to our funding service team. We will contact you for a short initial call and then send you the letter of intent via a link.

Need help with your funding application? Reduxi works with energy advisors and is happy to put you in touch.

Questions in advance: foerderservice@reduxi.eu

Which funding fits? *

Privacy policy

07Partner installers

Our partners in your region

e-lion

e-lion GmbH
Altsteirerstraße 1b
8562 Mooskirchen

Elektro Müller GmbH

Elektro Müller GmbH
Innstraße 14
6500 Landeck

Elektrotechnik Zaufl

Elektrotechnik Zaufl
Kleinrojach 8
9431 St. Stefan im Lavanttal

etrio GmbH

etrio GmbH
Kirchenstraße 16a
4615 Holzhausen

Haidtech GmbH

Haidtech GmbH
Martinerstraße 81
5522 St. Martin am Tennengebirge

Mitterhuemer Elektrotechnik GmbH

Mitterhuemer Elektrotechnik GmbH
Ennser Straße 31a
4400 Steyr

moserDIGITAL Energietechnik GmbH

moserDIGITAL Energietechnik GmbH
Betriebsgebiet Süd Str. C 6
3071 Böheimkirchen

SolarNow Photovoltaik GmbH

SolarNow Photovoltaik GmbH
Heinrich-Bablik-Straße 17
2345 Brunn am Gebirge

Marion Krassnig, Sales & Marketing, Reduxi DACH

✉Neem contact op met Reduxi nu

Learn more about Reduxi

I am happy to walk you through the process personally in a Teams call.

Marion KrassnigVerkoop & Marketing, Reduxi DACH

Information without guarantee, as of October 2026. Funding applications are submitted by our energy advisors. Sources: Austrian Climate and Energy Fund, programmes “Energy Management 2026” (households and businesses) and “Shared Energy Use 2026”.