Austrian Climate and Energy Fund. 4 funding programmes in Austria.
Investment grant for energy management in Austria: Secure your funding now
Reduxi products start at just €69 (before funding). On top of that, the Austrian Climate and Energy Fund covers up to 50% of the cost of a smart energy management solution and 30% of smart, connected battery storage.
Important for every programme: register first, then implement.
01Resumen de la financiación
Cuatro programas de financiación. ¿Cuál de ellos es el adecuado para usted?
The Climate and Energy Fund offers two funding schemes with a total of four funding options that are relevant for Reduxi customers. Each option has its own code (A1, A2, B1 or B2). This shows you at a glance which requirements apply to each funding option.
Applications are submitted directly via umweltfoerderung.at.
Need help with your application? Reduxi works with experienced energy advisors and is happy to put you in touch with the right contact person.
A · Gestión energética
Per site and applicant. Deadline: 15 April 2027, while the budget lasts.
B · Shared energy use – optimised system integration
For all active energy-sharing models (EEG, GEA, peer-to-peer and self-supply systems). Applications until 10 March 2027.
02Requisitos en un vistazo
Which requirements apply to which funding programme
Una fila por requisito, una columna por programa. Un signo de verificación indica que el requisito se aplica a ese programa.
| Requisitos | A1ProgramaHogares | A2ProgramaEmpresas | B1ProgramaDigitalización | B2ProgramaAlmacenamiento compartido |
|---|---|---|---|---|
| Quién y cuánto | ||||
| Who can apply | Personas físicas, conexión doméstica | Businesses, municipalities, homeowners’ associations (WEG); low voltage, up to 250 kW | Organiser or member of an existing, active project | Inversor, propietario y operador del almacén |
| Financiación | 50%, máximo €600 | Up to 30%, max. €20,000 (20% for large companies) | 50%, max. €12,000 | 30%, máximo 100.000 € netos |
| Bono de investigación | +€100 | +€1,000 | Ninguno | Ninguno |
| Fecha límite | 15 de abril de 2027 | 15 de abril de 2027 | 10 de marzo de 2027 | 10 de marzo de 2027 |
| Antes de ordenar | ||||
| Register or apply before you place a binding order. | Sí | Sí | Sí | Sí |
| Energy community on siteLocal area, minimum number of metering points | No | No | Sí | Sí |
| Comparison quote per main item | No | No | No | Sí |
| Tecnología | ||||
| An energy management system is required | Sí | Sí | No es obligatorio; los lectores de contadores inteligentes, las herramientas de análisis de datos y el control son elegibles. | No |
| Los controles de EMS controlan al menos dos dispositivosPV system, storage, charging point, heat pump | Sí | Sí | No | No |
| Cuatro funciones mínimasDevice control, dynamic prices, metering at the grid connection, load management | Sí | Sí | No | No |
| El control se ejecuta localmenteno cloud-only solution | Sí | Sí | No | No |
| New stationary battery system with 100 kWh capacity, ≥ 75% renewable energy | No | No | No | Sí |
| Incluye asesoramiento | No es elegible | Aceptable | Obligatorio | Planning for up to 10% of approved projects |
| Después de la instalación | ||||
| Instalación por una empresa especializada con licencia | Sí | Sí | Sí | Sí |
| Compromiso de cinco años | Operation | Operation | No | Shared use of the storage |
| Hora de poner en práctica | 6 meses | 6 months + 3 months for the final claim | 6 months + 3 months for the final claim | 9 months (up to 250 kWh) or 12 months, + 3 months for the final claim |
| Suscríbete a los servicios de software elegibles | No | No | No | No |
03Gestión energética · A1 y A2
Four required functions. Reduxi meets them all.
Energy management funding for private customers (A1) and businesses (A2) requires the same four functions. The control unit must work on site, even without a permanent internet connection.
04A winning duo for energy sharing
Energy optimisation by Reduxi. Energy billing by enixi.
Reduxi controls your energy in real time. On top of that, enixi supports you in running and billing your energy-sharing projects.
06Cómo funciona
Cinco pasos para obtener financiación
You fill in one form. Reduxi, enixi and our energy advisors take care of the rest.
Submit your request
Fill in the form below: contact details, desired funding and a short project description.
Initial call & letter of intent
We clarify your project and the right funding. Then you sign the letter of intent via a link.
Quote
Reduxi and your installer prepare your quote, including all documents for the funding application.
Funding application & approval
Our energy advisor submits the application. Then we release the project.
Order only after the application is received
Installation & final claim
Your installer installs Reduxi, optionally with energy-sharing billing via enixi. The final documents are then submitted.
1Funding request
Start your funding request
Your request goes directly to our funding service team. We will contact you for a short initial call and then send you the letter of intent via a link.
Need help with your funding application? Reduxi works with energy advisors and is happy to put you in touch.
Questions in advance: foerderservice@reduxi.eu
07Partner installers
Our partners in your region
e-lion GmbH
Altsteirerstraße 1b
8562 Mooskirchen

Elektro Müller GmbH
Innstraße 14
6500 Landeck

Elektrotechnik Zaufl
Kleinrojach 8
9431 St. Stefan im Lavanttal

etrio GmbH
Kirchenstraße 16a
4615 Holzhausen

Haidtech GmbH
Martinerstraße 81
5522 St. Martin am Tennengebirge

Mitterhuemer Elektrotechnik GmbH
Ennser Straße 31a
4400 Steyr

moserDIGITAL Energietechnik GmbH
Betriebsgebiet Süd Str. C 6
3071 Böheimkirchen

SolarNow Photovoltaik GmbH
Heinrich-Bablik-Straße 17
2345 Brunn am Gebirge
✉Contacta con Reduxi ahora
Learn more about Reduxi
I am happy to walk you through the process personally in a Teams call.
Information without guarantee, as of October 2026. Funding applications are submitted by our energy advisors. Sources: Austrian Climate and Energy Fund, programmes “Energy Management 2026” (households and businesses) and “Shared Energy Use 2026”.






